| 10/15/2025 - |
RUNWAY 14/32 CLOSURE |
| 9/18/2025 - |
AIRPORT OPERATIONS AWARENESS DURING UNGA, RYDER CU |
| 8/19/2025 - |
NOISE ABATEMENT PROGRAM |
| 12/10/2024 - |
Runway Closure |
| 12/2/2024 - |
Runway Closure |
| 11/27/2024 - |
Airport Fence Relocation |
| 9/30/2024 - |
Memo runway closure |
| 8/29/2024 - |
Runway 14/32 Daily Closures, Sept 4th and Sept 5th |
| 8/8/2024 - |
14/32 Runway Closures, Aug 12-13 |
| 8/6/2024 - |
WEATHER ALERT - FLOOD WATCH |
| 7/31/2024 - |
***UPDATED*** Runway 14/32 Daily Closures |
| 7/25/2024 - |
RUNWAY 14/32 DAILY CLOSURES JULY 29th - JULY 31st |
| 6/26/2024 - |
Airport Closure |
| 6/13/2024 - |
Runway 14/32 Closure |
| 5/25/2024 - |
Echo Ramp |
| 5/15/2024 - |
Runway Closure |
| 4/26/2024 - |
Runway Closure |
| 4/19/2024 - |
Online Payment Option Now Available! |
| 4/18/2024 - |
Runway Closures |
| 4/18/2024 - |
Runway Closures |
| 4/8/2024 - |
Online Payment Option Coming Soon!! |
| 1/9/2024 - |
Weather Advisory |
| 9/26/2023 - |
RAC Meeting |
| 9/15/2023 - |
Runway Closure |
| 8/31/2023 - |
Taxiway Alpha Project Updates |
| 7/28/2023 - |
Taxiway Alpha Project |
| 7/12/2023 - |
Taxiway Alpha Project Updates |
| 6/30/2023 - |
Construction Project Update |
| 5/12/2023 - |
RUNWAY CLOSED TO FIXED WING AIRCRAFT |
| 5/11/2023 - |
Update: Security Awareness |
| 5/10/2023 - |
TEMPORARY TAXIWAY ROMEO |
| 5/10/2023 - |
NEW HIGHWAY CLOSED SAT. MAY 13TH, 2023 |
| 5/5/2023 - |
RUNWAY 1/19 CLOSED TO FIXED WING AIRCRAFT |
| 5/1/2023 - |
Runway Closure |
| 4/28/2023 - |
PHASE 1B: TAXIWAY ALPHA REHABILITATION PROJECT |
| 4/12/2023 - |
TAXIWAY ALPHA REHABILITATION PROJECT (UPDATE) |
| 4/12/2023 - |
PHASE 1A: TAXIWAY ALPHA REHABILITATION PROJECT (U |
| 4/7/2023 - |
PHASE 1A: TAXIWAY ALPHA REHABILITATION PROJECT |
| 4/4/2023 - |
RAC Meeting |
| 3/29/2023 - |
TAXIWAY ALPHA REHABILITATION PROJECT |
| 3/1/2023 - |
TWY Alpha Project |
| 1/4/2023 - |
Taxiway Alpha Project |
| 12/22/2022 - |
Winter Storm Update |
| 12/6/2022 - |
Taxilane Lima Closure |
| 11/29/2022 - |
Weather Advisory |
| 11/25/2022 - |
Sales Tax Notice |
| 11/16/2022 - |
Security Awareness |
| 11/9/2022 - |
Weather Advisory |
| 11/7/2022 - |
Runway Closure |
| 11/1/2022 - |
Runway Closure |
| 10/25/2022 - |
Runway Closure |
| 10/7/2022 - |
Taxiway Alpha Survey |
| 10/7/2022 - |
Runway Closure |
| 10/5/2022 - |
VIP TFR |
| 10/3/2022 - |
Runway Closure |
| 9/30/2022 - |
Weather Advisory |
| 9/21/2022 - |
UPDATED Pilot Deviations and Runway Incursions |
| 9/20/2022 - |
Pilot Deviations and Runway Incursions |
| 9/8/2022 - |
RWY 14/32 Closure |
| 9/2/2022 - |
Taxiway Alpha Rehabilitation Project |
| 8/26/2022 - |
Runway Closure |
| 8/18/2022 - |
RWY 14/32 Closure |
| 8/9/2022 - |
Runway 14/32 Closed |
| 8/3/2022 - |
Heat Advisory |
| 7/27/2022 - |
Taxiway Alpha Rehabilitation Project |
| 5/16/2022 - |
Runway 14/32 Closure |
| 5/16/2022 - |
Main Terminal Ramp Closure |
| 5/16/2022 - |
Weather Advisory |
| 4/1/2022 - |
FRG ATC ZERO |
| 2/22/2022 - |
Taxiway Alpha Rehabilitation Project. |
| 1/28/2022 - |
Winter Weather Advisory |
| 10/14/2021 - |
Airport Registered Vehicles |
| 9/24/2021 - |
Runway 14/32 Closure 9/29/21 |
| 8/31/2021 - |
Heavy Rain 9/1-9/2 |
| 8/20/2021 - |
Runway 14/32 Closure |
| 8/20/2021 - |
Tropical Storm Henri |
| 8/19/2021 - |
Tropical Storm Henri / Possible High Winds |
| 8/17/2021 - |
Airport closed to fixed wing aircraft |
| 8/13/2021 - |
Runway 14/32 Closure |
| 8/6/2021 - |
Runway 14/32 Closure |
| 8/6/2021 - |
FRG Airport Diagram update |
| 7/8/2021 - |
Weather Advisory |
| 7/7/2021 - |
Weather Advisory |
| 6/23/2021 - |
Airport Beacon Relocation |
| 6/22/2021 - |
Notice of Runway closure 6/24/21 |
| 6/18/2021 - |
Annual Wildlife Review |
| 6/11/2021 - |
Notice of Runway Closure 6/15/21 |
| 5/21/2021 - |
RSA 1/19 Project Update |
| 5/14/2021 - |
Airport nighttime closure |
| 5/5/2021 - |
RSA 1/19 IMPROVEMENT PROJECT |
| 4/27/2021 - |
Airport Nighttime Closure |
| 4/20/2021 - |
RSAT meeting |
| 4/13/2021 - |
Taxi route Change |
| 4/12/2021 - |
Airport closure |
| 4/10/2021 - |
Taxi route change |
| 4/8/2021 - |
PPR Weapons memo |
| 4/7/2021 - |
Taxiway B route change |
| 3/31/2021 - |
FRG Nighttime closure |
| 3/26/2021 - |
Taxiway B route change REVISED |
| 3/25/2021 - |
Taxiway B route change |
| 3/4/2021 - |
Taxiway A nighttime closure |
| 3/1/2021 - |
High Wind Advisory |
| 3/1/2021 - |
Runway Closure (Update) |
| 2/26/2021 - |
Runway Closure |
| 2/23/2021 - |
CDC Mask Requirement |
| 2/11/2021 - |
Runway Closure |
| 2/5/2021 - |
TAXIWAY A NIGHTTIME CLOSURE UPDATE |
| 1/26/2021 - |
Construction Closures |
| 1/22/2021 - |
TAXIWAY A NIGHTTIME CLOSURE |
| 1/19/2021 - |
Tenant Awareness Notice |
| 1/15/2021 - |
Security Awareness |
| 1/13/2021 - |
Travel Advisory |
| 12/23/2020 - |
High wind advisory |
| 12/23/2020 - |
Runway 14/32 Closure Date change |
| 12/22/2020 - |
Airport closure for fixed wing aircraft. |
| 12/3/2020 - |
New York State Travel Guidelines |
| 12/3/2020 - |
Airport closure for fixed wing aircraft. |
| 11/14/2020 - |
NOTICE OF RUNWAY SAFETY AREA (RSA) PROJECT |
| 11/3/2020 - |
Tower Operating Hours |
| 10/29/2020 - |
Tenant Awareness Notice |
| 9/29/2020 - |
Weather Advisory |
| 9/15/2020 - |
Airport Construction |
| 9/15/2020 - |
Airport Badging |
| 9/9/2020 - |
Restricted States 9/9/2020 |
| 8/26/2020 - |
Severe Weather Advisory |
| 8/25/2020 - |
Restricted States |
| 8/17/2020 - |
Travel Advisory *Update* |
| 8/13/2020 - |
Travel Advisory |
| 8/7/2020 - |
Tower Operating Hours Update |
| 6/23/2020 - |
Notice Of Blood Drive |
| 5/19/2020 - |
BEST PRACTICES DURING NON-TOWERED OPERATIONS |
| 5/6/2020 - |
RUNWAY 14/32 CLOSED |
| 5/4/2020 - |
Vehicle Access Gate Reminder |
| 4/29/2020 - |
Coronavirus - Update |
| 4/21/2020 - |
Airport Closed To Fixed Wing Aircrafts |
| 4/2/2020 - |
Novel Coronavirus Outbreak Guidelines UPDATE |
| 3/22/2020 - |
Tower Closure |
| 3/18/2020 - |
Change in Instrument Departure Climb Gradient |
| 3/17/2020 - |
Coronavirus |
| 1/10/2020 - |
Runway Closure |
| 1/8/2020 - |
Heightened Security |
| 12/10/2019 - |
ATC/Pilots |
| 11/19/2019 - |
Seversky Road Painting |
| 11/13/2019 - |
ATC/Pilots Meeting Reminder |
| 11/5/2019 - |
ATC/Pilots Meeting |
| 11/5/2019 - |
Wash Rack |
| 5/31/2019 - |
Vehicle Access Gate Penalty |
| 5/29/2019 - |
Runway Closure |
| 5/17/2019 - |
Suspicious Person |
| 5/9/2019 - |
Tenant Awareness Notice |
| 4/16/2019 - |
Runway Closure |
| 4/5/2019 - |
Airport Security Assessment |
| 4/2/2019 - |
Pedestrian Gates |
| 2/26/2019 - |
New Taxiway Opening, Hotel (H) |
| 12/21/2018 - |
Republic Airport High Wind Advisory |
| 12/18/2018 - |
Republic Airport Suspicious Person Lookout |
| 10/26/2018 - |
Republic Airport High Wind Advisory |
| 10/16/2018 - |
Republic Airport Runway 14-32 Closure |
| 8/27/2018 - |
Republic Airport Main Terminal No Parking |
| 8/15/2018 - |
Republic Airport Traversing Echo Ramp |
| 7/24/2018 - |
Echo Area Tie-Down |
| 7/24/2018 - |
Echo Area Tie-Down |
| 7/23/2018 - |
Echo Aera Tie-Down Ramp Southeast Corner |
| 5/16/2018 - |
Runway 14/32 Closure May 17th - May 28th, 2018 |
| 5/8/2018 - |
TEMPORARY RUNWAY & TAXIWAY CLOSURES |
| 3/8/2018 - |
Echo Ramp Reconfiguration Notice |
| 3/5/2018 - |
Suspicious Person Republic Airport |
| 3/1/2018 - |
Republic Airport High Wind Advisory |
| 10/31/2017 - |
Republic Airport Runway 14/32 Closures |
| 10/27/2017 - |
Republic Airport High Wind Advisory |
| 9/11/2017 - |
Airport Closure |
| 6/19/2017 - |
High Wind Advisory |
| 5/24/2017 - |
2017 Jones Beach – AIRSHOW / TFR |
| 5/9/2017 - |
Annual Aircraft Owner and Operator Meeting |
| 5/3/2017 - |
New York Area Temporary Flight Restriction (TFR) |
| 5/2/2017 - |
TEMPORARY RUNWAY & TAXIWAY CLOSURES |
| 4/7/2017 - |
Aircraft |
| 3/21/2017 - |
PUBLIC MEETING NOTICE |
| 3/13/2017 - |
Blizzard Warning and High Wind Advisory |
| 2/23/2017 - |
Notice of March 2nd Meeting |
| 1/23/2017 - |
WEATHER ADVISORY |
| 1/11/2017 - |
Samsung Galaxy Note7 Reminder |
| 12/21/2016 - |
New Airport Manager |
| 11/10/2016 - |
Temporary Night Time Closure of Runways |
| 9/23/2016 - |
Runway Closure Notice |
| 9/15/2016 - |
Main Terminal Ramp Closure Notice |
| 9/12/2016 - |
Runway Closure 1-19 / Film Shoot |
| 9/6/2016 - |
Airport Pavement Joint Sealing Project |
| 9/2/2016 - |
Tropical Storm Hermine / High Wind Alert |
| 8/24/2016 - |
FLIGHT OPS NOTICE |
| 8/1/2016 - |
Runway Closure 14-32 / Painting |
| 7/7/2016 - |
ECHO PARKING LOT CLOSURE NOTICE |
| 5/25/2016 - |
Main Terminal Ramp Closure |
| 5/16/2016 - |
Echo Ramp Safety During Memorial Day Air Show |
| 5/16/2016 - |
Main Terminal Ramp Procedures During Air Show |
| 5/10/2016 - |
Main Terminal Ramp Closure |
| 5/5/2016 - |
Runway Paint and Inspection Project |
| 4/28/2016 - |
Seversky Road- Temporary Closure |
| 4/11/2016 - |
Runway Closure- Runway 1/19 |
| 4/6/2016 - |
Annual Aircraft Owner and Operator Meeting |
| 4/5/2016 - |
Seversky Road- Temporary Closure |
| 3/22/2016 - |
Temporary Closure of Runway 14/32 |
| 3/14/2016 - |
ANNUAL AIRCRAFT OWNER/OPERATOR MEETING NOTICE |
| 3/10/2016 - |
Sad News |
| 2/24/2016 - |
Weather Advisory |
| 1/28/2016 - |
Bereavement Notice |
| 11/18/2015 - |
Heightened Security Awareness |
| 10/23/2015 - |
Temporary Closures of Runway 14/32 and Runway 1/19 |
| 10/6/2015 - |
Runway Survey Project |
| 10/2/2015 - |
HURRICAINE JOAQUIN UPDATE |
| 10/1/2015 - |
High Wind Alert and Flooding Notice |
| 9/29/2015 - |
HEAVY RAIN IS LIKELY LATE TUESDAY INTO WEDNESDAY |
| 8/3/2015 - |
Airport Paint Project |
| 7/20/2015 - |
Vietnam Commemorative Medal Ceremony |
| 7/17/2015 - |
For more information on the TFR |
| 5/19/2015 - |
Main Terminal Ramp Procedures During Air Show |
| 3/31/2015 - |
Temporary Runway Closure- Runway 1/19 |
| 3/17/2015 - |
Invitations to Owner Operator Meeting |
| 3/17/2015 - |
Annual Aircraft Owner and Operator Meeting |
| 11/20/2014 - |
2014 Pearl Harbor Invitation |
| 10/17/2014 - |
Temporary Closures of Runway 14/32 and Runway 1/19 |
| 9/26/2014 - |
Main Terminal Ramp Closure |
| 9/23/2014 - |
Temporary Closures of Runway 14/32 and Runway 1/19 |
| 8/28/2014 - |
VIP TFR over White Plains, NY |
| 8/26/2014 - |
WINGS OF FREEDOM TOUR |
| 8/5/2014 - |
Airport Paint Project |
| 8/1/2014 - |
Construction and Work Zone Safety |
| 5/15/2014 - |
Main Terminal Ramp Closure Notice |
| 5/13/2014 - |
Runway 14/32 Closures May 18th – 20th, 2014 |
| 4/21/2014 - |
GARDEN OF REMEMBRANCE |
| 4/7/2014 - |
Runway Closure Notice |
| 4/3/2014 - |
Memorial Ceremony April 7th |
| 4/1/2014 - |
Annual Aircraft Owner and Operator Meeting |
| 1/15/2014 - |
Scheduled Maintenance Notice |
| 11/18/2013 - |
PEARL HARBOR MEMORIAL CEREMONY |
| 9/10/2013 - |
AAPM 9/11 TRIBUTE |
| 9/5/2013 - |
SEMINAR NOTICE |
| 8/26/2013 - |
Main Terminal Ramp Closure |
| 7/26/2013 - |
NOTICE TO ECHO TENANTS |
| 5/15/2013 - |
Main Terminal Ramp Closure |
| 5/15/2013 - |
Echo Ramp Safety During Memorial Day Air Show |
| 5/3/2013 - |
JOINT SEALING NOTICE |
| 4/12/2013 - |
POWER OUTAGE NOTICE |
| 4/8/2013 - |
Memorial Garden |
| 4/3/2013 - |
RUNWAY EMAS NOTICE |
| 3/27/2013 - |
ANNUAL MEETING NOTICE |
| 2/13/2013 - |
WINTER WEATHER ADVISORY |
| 1/31/2013 - |
SAFETY, INFRASTRUCTURE, TENANT IMPROVEMENT PROJ |
| 1/30/2013 - |
SAFETY,INFRASTRUCTURE,&TENANT IMPROVEMENT PROJECT |
| 1/30/2013 - |
HIGH WIND ADVISORY |
| 12/3/2012 - |
Pearl Harbor Memorial Ceremony |
| 11/5/2012 - |
HIGH WIND ALERT |
| 11/3/2012 - |
HURRICANE SANDY- AIRPORT UPDATE |
| 11/2/2012 - |
HURRICANE SANDY - AIRPORT UPDATE |
| 11/1/2012 - |
HURRICANE SANDY - AIRPORT UPDATE for NOVEMBER 2 |
| 10/31/2012 - |
HURRICANE SANDY - AIRPORT UPDATE |
| 10/30/2012 - |
HURRICANE SANDY - AIRPORT UPDATE |
| 10/26/2012 - |
HI WIND ALERT TO ALL BADGEHOLDERS |
| 10/15/2012 - |
New York Area Temporary Flight Restriction (TFR) |
| 10/15/2012 - |
Republic Airport Tenants & Users/Operators |
| 10/3/2012 - |
FAA Announces 34th Annual General Aviation Survey |
| 9/28/2012 - |
Runway 14/32 EMAS Construction Update |
| 9/17/2012 - |
New York Area Temporary Flight Restriction (TFR) |
| 9/17/2012 - |
Main Terminal Ramp Closure |
| 9/11/2012 - |
Temporary Closure-Runway 14/32 |
| 8/22/2012 - |
RUNWAY 1/19 PAINT PROJECT |
| 8/7/2012 - |
RUNWAY CLOSURE NOTICE |
| 7/10/2012 - |
Runway Paint and Inspection Project |
| 7/5/2012 - |
ROAD CONSTRUCTION NOTICE |
| 6/29/2012 - |
ROAD CONSTRUCTION NOTICE |
| 6/12/2012 - |
Garden Of Remembrance |
| 6/11/2012 - |
REMINDER--Temporary Closures of Runways |
| 5/29/2012 - |
U.S. Customs and Border Protection |
| 5/29/2012 - |
Temporary Closures of Runway 14/32 and Runway 1/19 |
| 5/25/2012 - |
CFIs operating at FRG |
| 5/14/2012 - |
Runway 14/32 Closures May 20th – 23rd, 2012 |
| 4/17/2012 - |
ANNUAL AIRCRAFT OWNER & OPERATOR MEETING REMINDER |
| 4/17/2012 - |
AIRPORT PAVEMENT JOINT SEALING MAINTENANCE |
| 4/5/2012 - |
Runway Closure-Runway 14/32 |
| 4/4/2012 - |
ANNUAL AIRCRAFT OWNER AND OPERATOR MEETING NOTICE |
| 3/1/2012 - |
NY TRACON LETTER TO AIRMEN NO 12-6 |
| 3/1/2012 - |
NY TRACON LETTER TO AIRMEN 12-3 |
| 2/29/2012 - |
REPUBLIC AIRPORT - VISION PLAN SUMMARY OF INPUT |
| 2/24/2012 - |
URGENT WEATHER MESSAGE - HIGH WIND WATCH |
| 2/14/2012 - |
Runway 1/19 Closure Date REVISED |
| 2/14/2012 - |
RUNWAY 1/19 CLOSURE |
| 1/11/2012 - |
FRG RSAT 2012 INVITE |
| 12/14/2011 - |
AIRPORT PLAZA CONSTRUCTION |
| 11/17/2011 - |
PEARL HARBOR MEMORIAL CEREMONY - DECEMBER 7, 2011 |
| 10/19/2011 - |
Republic Airport Garden of Remembrance |
| 9/9/2011 - |
REPUBLIC AIRPORT SECURITY ALERT |
| 9/6/2011 - |
2011 UNGA FLIGHT ADVISORY |
| 8/25/2011 - |
HIGH WIND ALERT NOTICE |
| 8/9/2011 - |
REPUBLIC AIRPORT - VISION PLAN OPEN HOUSE |
| 7/29/2011 - |
Republic Airport Visioning Plan Open House |
| 7/29/2011 - |
RUNWAY 14/32 CONSTRUCTION UPDATE |
| 5/5/2011 - |
Runway 14/32 EMAS Construction Update |
| 4/20/2011 - |
Airport Pavement Joint Sealing Maintenance |
| 4/12/2011 - |
Runway 14/32 Construction |
| 4/12/2011 - |
Airport ID Badge Holder Information |
| 4/12/2011 - |
NOTICE TO ALL BADGE HOLDERS |
| 4/4/2011 - |
Annual Airport Owner & Operator Meeting Reminder |
| 4/4/2011 - |
Runway 14/32 Closure-Thursday, April 7th |
| 3/25/2011 - |
Annual Aircraft Owner & Operator Meeting Notice |
| 3/10/2011 - |
ANNUAL AIRCRAFT OWNER & OPERATOR MEETING |
| 2/25/2011 - |
HIGH WIND WARNING |
| 2/25/2011 - |
HIGH WIND WARNING |
| 2/1/2011 - |
WINTER STORM ADVISORY - 2/1/11 - OEM ADVISORY #19 |
| 2/1/2011 - |
RUNWAY SAFETY ACTION MEETING -RESCHEDULED |
| 2/1/2011 - |
WINTER STORM WARNING ADVISORY FEB 01, 2011 |
| 1/31/2011 - |
WINTER STORM WATCH |
| 1/27/2011 - |
Testing 1 |